Technology & Science

Record Danube Drought Forces First-Ever Shutdown of Hungary’s Paks Nuclear Plant, Triggering Regional Power Scramble

Engineers took the final Paks reactor offline on 2 Aug 2026 after the Danube fell below –134 cm, instantly erasing nearly half of Hungary’s electricity supply and pushing Budapest into emergency rationing.

By Underlines Team

Focusing Facts

  1. Loss of the full 2 GW plant capacity is projected to cost Hungary 100–200 billion forints (≈US$316–630 million) in extra power imports, according to Vice-Chair Mark Radnai.
  2. Slovakia’s Prime Minister Robert Fico pledged on 1 Aug to export surplus output from Mochovce and Bohunice, whose different closed-loop cooling systems keep 1.9 GW available.
  3. A separate 400 MW gas unit at Dunamenti was rushed back online on 1 Aug, partially offsetting the nuclear shortfall but still leaving a net deficit of ~1.6 GW.

See how 3 sources reported this story.

Where they agree. Where they disagree. What they left out.

  • ✓ Full multi-perspective analysis on every story
  • ✓ Primary source links for every claim
  • ✓ Daily email briefing — no algorithm

Perspectives in this article

  • Pro-government Hungarian media
  • International mainstream & liberal outlets
  • Slovak and regional neighbour coverage
Share

Related Stories