Business & Economics
Chevron-Iraq MOUs Kick Off West Qurna 2/Nassiriya Expansion and Mediterranean Bypass Pipeline Study
On 17 July 2026 Chevron and Baghdad signed non-binding accords to assume West Qurna-2, develop Nassiriya blocks, and begin technical studies on a Syria- or Turkey-bound pipeline that would move Iraqi crude to the Mediterranean, escaping the war-choked Strait of Hormuz.
Focusing Facts
- West Qurna-2 now produces ≈460,000 bpd; the Chevron plan targets 750-800 kbpd once fully redeveloped.
- The Kirkuk-Baniyas route under review is ~500 mi long and was formally tabled at the U.S.–Iraq Business Summit in Washington on 17 July 2026.
- Separately that same day, Iraq and Syria signed a deal to rebuild the 1952 Kirkuk-Baniyas pipeline (700,000 bpd nameplate) that has been offline since the 2003 U.S. invasion.
See how 3 sources reported this story.
- ✓ Full multi-perspective analysis on every story
- ✓ Primary source links for every claim
- ✓ Daily email briefing — no algorithm
Perspectives in this article
- Business and investor-focused financial media
- U.S. right-leaning political media
- Mainstream geopolitical news wires and broadcasters